Hartbeespoort dam history
Hartbeespoort dam is in a hypertrophy state. It is 1 of 9 Hypertrophy in RSA and 7 of 9 in Crocodile Marico Catchments.
- The dam water is excessively enriched by phosphate and nitrogen nutrients, where algal growth is limited by physical conditions, solar radiation and water temperature
Due to rapid urban development and industrial growth in the Hartbeespoort Dam catchment area, the volumes of water loaded with plant nutrients (phosphates and nitrates) reaching the dam have increased.
This results in the deterioration of the water quality due to the loss of oxygen and biodiversity. This excessive fertilization condition is called eutrophication, which is a global phenomenon and problem
- Goal of the Project
- Introducing the Shaka Swirl
- Technical Approach
Processes in a dam reservoir
There are 28 Sewage Treatment Works (STW)
Pre-dam of a reservoir
A state of the Art Revolutionary Sewerage Treatment
Technical measures for the improvement of reservoir water quality
Overview
There are 28 Sewage Treatment Works (STW) discharging into rivers that end up in Hartbeespoort Dam, most of which their final effluent does not conform to SA discharge standards
To guarantee that the final effluent from these STW conforms, bio augmentation blends should be introduced to accelerate the bio degradation process, which prevents and pollution including waterborne diseases such as dysentery, diarrhea, typhoid and cholera in the rivers
By adding scientifically selected blends to the final effluent discharge the biodegradation process will continue in the rivers thereby ensuring a clean water quality flowing into dam
Restoration of water quality and disturbed ecosystem
- Reduce the load to the Brits water treatment plant and Hartbeespoort water treatment
This implies the application of a well-selected mixture of Evaluation of the situation.
Detailed planning of technical measures
Our Solutions
Motivation – current activities and program. Goals of the project.
2.3.1 Measure for the river basin and the reservoir
2.3.2 Measure of the Dam reservoir
2.3.3 Summary of technical measures
2.4 Training and educational programme
2.5 Implementation programme based on prioritization of activities and Supervision by R/P
3.Project Team